Industrial compucter and specific software
Hydraulic shearer and folding machine
Four hydrautlic notch and die
One leveler grooving roller machine
1-2 power metal feeding frame(equipped with 2 or 4 coil frames)
Basic Equipment:
Coiler------Rawmaterial Feeder------Leveler Grooving Roller--------Notch and Punch Square-----Cut Feed Metal for TDF------Cut Feeding Metal for Duct
work flow:
Duct Manufacturing Auto Line 3
Duct Manufacturing Auto Line 3
Delivery Time: | 8~30 days |
Supply Ability: | 3 Set/Sets per Month |
Minimum Order Quantity: | 1 Set/Sets |
Payment Terms: | T/T |
Port: | Huangpu |
Model Number: | LTF |
Brand Name: | GZHCH |
Place of Origin: | Guangdong China (Mainland) |
Auto Duct Production Line 4 It\'s mainly for uncoiling, leveling, beading, punching, locking, bilaterally angle steel or TDF flange forming. Because of its small space requirement and easy to install and operate, people also call it \"small line 5\". Auto Air Duct Fabrication ...
Auto Duct Production Line 3 Duct production line 3 can drive blanking for duct. Meantime, it’s very suitable for diversified production like TDF/angle steel/inserted flange forming; the angle steel flange and inserted flange can be bent into square-shaped pipe automatically. ...
Air Duct Machine for Sale Auto Duct Production Line 2 Duct production line 2 can drive blanking for duct and TDF flange forming machine at the same time. Combined with TDF flange forming machine, rolling reel machine, crimping machine and relevant comer code, duct production ...