Industrial compucter and specific software
Hydraulic shearer and folding machine
Four hydrautlic notch and die
One leveler grooving roller machine
1-2 power metal feeding frame(equipped with 2 or 4 coil frames)
Basic Equipment:
Coiler------Rawmaterial Feeder------Leveler Grooving Roller--------Notch and Punch Square-----Cut Feed Metal for TDF------Cut Feeding Metal for Duct
work flow:
Duct Manufacturing Auto Line 3
Duct Manufacturing Auto Line 3
Delivery Time: | 8~30 days |
Supply Ability: | 3 Set/Sets per Month |
Minimum Order Quantity: | 1 Set/Sets |
Payment Terms: | T/T |
Port: | Huangpu |
Model Number: | LTF |
Brand Name: | GZHCH |
Place of Origin: | Guangdong China (Mainland) |