bagging scale

3.            If find the pneumatic components work unstably, you should first check the pipe and cylinder if leak, and then check the magnetic valve if works normally.

2.            You should always check the drain of the filtering cup in triple piece; add the lube to oil cup in time, and you need to always check the oil in oil cup if can be atomized into the pipe when in work.

1.            Check the air supply before powering on, keep the air pressure in about 0.5pa;

Considerations and daily maintenance:

First, close the valve of the discharging exit to prevent the materials from falling down; please dont put your hand to the material-adding machine on self-checking process to prevent accidentally hurting.

Attention:

PressSETtwo times to display SET1, press+12 times to display SET13, pressENTERand it starts to do self-checking. On self-checking process, each output is connected in turns, fast adding

use in wharf position, and packing food

  • easy to use:easy to transport
  • Type:General
  • Automatic Grade:Automatic
  • Usage:Outer
  • Packaging:Other
  • Processing:Packaging Line
  • Model Number:DCS
  • Brand Name:light
  • Place of Origin:China (Mainland)
  • Country:China (Mainland)
  • telephone:86-21-22819567
Delivery Time: 30days
Package: wood box
Supply Ability: 50 Set/Sets per Month
Minimum Order Quantity: 1 Set/Sets
Payment Terms: T/T
Port: Shanghai
FOB Price: US $4,490 - 12,500
Type: General
Automatic Grade: Automatic
Usage: Outer
Packaging: Other
Processing: Packaging Line
Model Number: DCS
Brand Name: light
Place of Origin: China (Mainland)
*Your name:
*Your Email:
*To:Shanghai Light Industry Co., Ltd.
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters Remaining: 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

We do inquire for you , please wait ...