Solar Inspection System

SBL 01 ..................... Solar Blister Line Loader PDF-Download Print Function Production process of Si solar cells for PV applications requires a metallization step to provide electrodes to the front and back side of the wafers. Such metallization lines may either be integrated into a complete inline process, or be designed as island solution. The latter requires loading of the wafers to a metallization line, e.g. from so called coinstack blister packages. The SBL01 Solar Blister Line Loader machine automatically picks up wafers from stacks and accurately places them on integrated transportation belts. The wafers are provided in stacks of up to 100 pcs. per blister box. The boxes can be accessed by a drawer. The drawer takes three boxes in two rows each. One wafer per box, i.e. three wafers in total are picked up simultaneously allowing to safe and reliable separation from the stack within the cycle time of the machine. These three wafers are placed on the transportation belt at a time. If one row of three boxes is emptied the machine automatically switches over the other row. With the total load of 600 wafers the machine allows for half an hour uninterrupted operation before next operator refill. Optionally the machine may be equipped with two separate drawers taking up 3 boxes with total 300 wafers each. This option allows uninterrupted operation during exchange or refill of emptied boxes. Blister boxes are available for 125, 150 and 156 mm wafer size. The operator will be notified when blister boxes are emptied. The machine my also be used to load other line segments or process / testing equipment. Special features _ For mono- and poly-crystalline Si wafers, up to 156mm _ Line loading of wafers to metallization line or other equipment _ 6 coinstack blister boxes for up to 600 wafers _ Automatic alarms Options _ Configuration with 2 individual drawers for uninter rupted operation _ Extra blister boxes are available for 125, 150 and 156 mm wafer size

Additional signal tower lamps, LED lamps or horn

  • Country:Singapore
  • telephone:65-65 6280 8887
Additional signal tower lamps, LED lamps or horn
*Your name:
*Your Email:
*To:ASYS Group Asia Pte Ltd
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters Remaining: 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

We do inquire for you , please wait ...

4.2KW-10.2KW Home Hybrid Solar Storage System

The household solar power supply systems are mainly aimed at home users. With the maturity of solar energy technology and the decline in costs, solar power generation, which was originally only used in commercial and industrial fields, has been slowly extended to the civilian ...

Come From Guangzhou Anern Energy Technology Co., Ltd

15KW-50KW Commercial Off Grid Solar Power Storage System

Commercial solar power supply systems are mainly aimed at high-power commercial and industrial electricity applications. If your house has many high-power appliances and the daily power consumption is large, then the 15KW 20KW 30KW 50KW off grid solar power systems are prepared ...

Come From Guangzhou Anern Energy Technology Co., Ltd

10KW-200KW Three Phase On-Grid Solar System

Three phase solar power generation systems can also be applied to commercial, industrial, and government power stations. Compared with the grid-tied system for home use, the grid-tied system for industrial and commercial use in order to meet the daily power consumption, the ...

Come From Guangzhou Anern Energy Technology Co., Ltd