printed polyester laminated with metallised polyester (if required) and LD film of required thickness.
Delivery Time: | 4-6 weeks |
Package: | 40 kg bags |
Supply Ability: | 100 Metric Ton per Month |
Minimum Order Quantity: | 5 Metric Ton |
Payment Terms: | L/C |
Place of Origin: | Uttar Pradesh, India |