Footwear

1.The installation of acoustic mounts and furring channels may be done by others; acoustic mounts have to be installed prior to the Polyair insulation.2.Install acoustic mounts to specified distance apart, without the furring channel clip attached.3.Roll out Polyair Insulation, ensure roll is level and push insulation over spike or screw of the acoustic mount so it penetrates through the material.4.Butt join and tape off where required, using a squeegee or straight edge tool.5.Attach furring channel clip, and adjust the threaded through bolt to create a gap between the wall and insulation approximately 20mm.6.Install furring channel.

Basic

  • Country:South Africa
  • telephone:27-27 13 737 7523
Basic

Rogue

Enter 20 to 3,000 English characters. Characters: 0 / 3000

Submitting We are sending your inquiry, please wait...