f), (RAL) Color you want;
e), Loading capacity of each level?
d), How many levels of the racking?
c), Size of the racking (H*W*L);
b), Size of your warehouse;
a), Drawing (if available);
Please inform us of the following information for quick quotation:
15), MOQ: 1X20 container
14), Payment terms: By TT or sight LC
13), Delivery time: 15 days for 1x20 container, 20 days for 1x40 container
12), Container load:10-15 ton per 1x20 container, 20-25 ton per 1x40 container
11), Different sizes are available;
10), Packing: Neutral paper box or in bulk or upon clients requirements;
9), Surface treatment: powder painting;
8), First level pallets can be placed on the floor;
7), compatible with most type of handling equipment and building structures;
6), Stable structure, large loading capacity, convenient sorting;
5), Rich accessories: upright protector, guide rail, frame barrier, row spacer, wire decks, steel shelf, etc.;
4), Connection of the upright and beam is by wedging, equipped with safety pin to make sure of the safety;
3), Box beam or step beam used. Beam can be freely adjusted by pitch 50mm or 75mm;
2), Upright is formed by high-quality cold rolled steel, with an omega shaped section and hole distance 50mm or 75mm;
1), The most popular and economical racking in warehouse;
racking,heavy rack,stacking equipment
racking,heavy rack,stacking equipment
1, Goods can be easily removed as each pallet can be
accessed individually.
Delivery Time: | 15 days for one 20 feet container/ according to each order |
Package: | export package/at buyer's option |
Supply Ability: | 3000 Ton per Month |
Minimum Order Quantity: | 1X20' container |
Payment Terms: | L/C,T/T |
Port: | Nanjing/Shanghai/others |
colour: | RAL SYSTEM |
Material: | Metal |
Model Number: | TP-01 |
Brand Name: | TOPSUN |
Place of Origin: | Jiangsu China (Mainland) |