6.We can also provide industrial design and 3D drawing.
5.Lead time:4-7 running working days;
4.Verify your design inspiration;
3.CNC rapid prototype,high precision;
2.Handcraft:polishing,electropainting (spray painting/silk screen/texture/tinted etc.)
1.Material:ABS(PA/PC/PP/POM/PMMA/COPPER etc.)
Prototype NO.B-02495
1.CNC RAPID PROTOTYPE
2.HIGH PRECISION
3.SHORTEN R&D CYCLE TIME
4.VERIFY YOUR INSPIRATION
5.BEST MARKET TEST-STONE
Delivery Time: | 4-7 running working days |
Package: | carton or wooden box |
Supply Ability: | 10 Piece/Pieces per Week |
Minimum Order Quantity: | 1 Piece/Pieces |
Payment Terms: | T/T |
Color:: | Tinted as require |
Brand Name:: | BOLE |
Finishing:: | electropaint |
Model Number:: | B-02495 |
Place of Origin:: | China |
Model Number: | B-02495 |
Brand Name: | BOLE |
Place of Origin: | Guangdong China (Mainland) |