4. Cautions
1. No high-heeled or leather shoes, Easy-off-color sport shoes should also be prohibited
2. Prohibit cutting or extrusion, no friction on the surface with the solid objects, so as to avoid damage or rupture.
3. No using of acid, alkali corrosion and other chemicals , fire ,heat should be kept off to avoid deformation of the floor.
3.Cleaning equipment which will hurt the floor should not be used. Neutral detergent can be used when cleaning, but should be cleaned with water afterwards and clean the remaining water with water scooping machine or a mop. This can avoid dirt settled out. Footprints and stain should be cleaned immediately by cleaning method.
1. Most sport floor has field line (painted or pasted on the surface). It is necessary to protect the lines when making cleaning and maintenance. Door mat should be place at the entrance where has
large flow of treads.
2.Regular maintenance will remain floor surface and prolong the service life of the floor. Every day using mop or cleaner to clear the dust on the surface. For small area we can clean manually, for
medium or large area we can use cleaning machine as well.
3. Cleaning and maintenance for PVC floor
3. Floor welding: before welding notch on the floor and clean the residue , the welding temperature should be above 500. Using a short line to test to find the appropriate the welding of temperature and speed. After cooling , remove excess welding wire at the welding place in two steps , with crescent spatula cut off half of welding wire, when the welding line fully cooled, shovel rest.
Before sticking up, reverse about half of the floor, then paste the Double Faced Adhesive Tape on the ground , then lay down the floor slowly.
Paving method: the floor board should be expanded flatly on the ground over 24 hours before paving, and the temperature should be above 15 ; lay the floors on the ground by the numbers marked on them and according to lines on the ground. When cutting 5cm more should be kept on each edge,
Basic requirements: the aimed ground must be plane, clean, lasting dry, and no cracks
2.PVC floor paving method
a. All fixed: paste the floor board on the ground by painting adhesive specially used for sport floor.
b. Partially fixed: 10cm painting of adhesive to the edge of the floor board on the ground to fix the floor
2. Fixed installation
1.Movable installationuse special connecting band between floor boards for future moving, no adhesive to the ground
1. PVC floor installation Method
we can supply various kinds of PVC flooring
Payment Terms: | L/C,T/T |
Port: | tianjin |
Model Number: | P-02 |
Brand Name: | HRX |
Place of Origin: | Hebei, China (Mainland) |
Material: | PVC |
Model Number: | P-02 |
Brand Name: | HRX |
Place of Origin: | Hebei China (Mainland) |