Unit Commitment and Risk Analysis System SOFTWARE

Energy Demand (load)
Reserve Margin Capacity
Min and Max Output (AFC operating Range)
Ramp Up and Down
Min Operation and Down Hours
Daily and Weekly Start and Stop Limits
Min and Max Fuel Consumption Limits
Scheduled Maintenance
Pumped Storage and Reservoir Capacities
Pattern Selections for Bilateral Contracts
Min and Max Utilization for Bilateral Contracts
Must Run Units
Boil of Gas (BOG) Units
Generator Startup Limits in the Same Control Center
Governer Free (GF) Requirements
Thermal Unit Uplift
CO2, SO2, NOx Emission Limits
Emission Allowance Prices

We offer one of the most advanced electric power generator scheduling systems for large utility companies. A Mixed Integer Programming (MIP)-based unit commitment model generates optimum solutions for up to 100 generating units in 8760 hours while satisfying the following constraints.

We offer one of the most advanced electric power generator scheduling systems for large utility companies

  • Type:System Utilities & Maintenance
  • Country:United States
  • telephone:1-571-214-4689
Type: System Utilities & Maintenance
*Your name:
*Your Email:
*To:neomeshsolutions
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters Remaining: 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

We do inquire for you , please wait ...