Mezzanine floor

Export packingbeam and upright use plastic wrapping film, and other match parts use paper carton.

1) The AutoCAD drawing or draft drawing of the warehouse and mezzanine.
2) The size of the warehouse?
3) How many layers?
4) The size of shelving?
5) The loading capacity of each layer?
6) The loading capacity of each square meter of the floor?
7) The RAL color?

Required information for quick quotation:

1) Great productivity, savings, and profit.
2) If your plant is out of warehouse or plant space, think UP, not out.
3) The mezzanine can be written off as capital equipment.
4) Maximize your inventory control.
5) Speed up product distribution.
6) Eliminate leased space costs.
7) Remember, if you're leasing a space and you build in a permanent mezzanine you just increased the landlord's net worth, not your company's! So use Cascade Equipment's modular removable mezzanines!
8) Save building maintenance costs.
9) Maximize cubic space in your plant or warehouse.
10) Save travel time to and from multiple locations.
11) Organize storage of materials and company records.
12) Create new production and assembly areas.
13) Stop employee logistic and communication problems.
14) Secure an area to eliminate theft problems.
15) Save on property taxes and land acquisition costs.
16) Save on new construction costs.
17) Centralize multiple location operations.
18) Increase employee productivity.
19) Save on utility costs.
20) Improve product flow.
21) Increase order output.

Features of Mezzanine(mezzanine floor, multi tier racking, mezzanine rack, platform):

Work platform, Working platform, Construction platform

Steel structure platform, Metal platform

Multi layer racking, Platform

Rack Mezzanine, Multi Tier Racking,

Mezzanine floor,  Mezzanine Rack, Mezzanine Racking,

Mezzanine floor/mezzanine flooring

The mezzanine can be written off as capital equipment.
Maximize your inventory control.
Speed up product distributies

  • Place of Origin:Jiangsu China (Mainland)
  • Country:China (Mainland)
  • telephone:86-25-66612312
Delivery Time: 15 working days after receiving the deposit
Package: Mezzanine floor, Mezzanine Rack, Mezzanine Racking, Rack Mezzanine, Multi Tier Racking, Multi layer racking, Platform,Steel structure platform, Metal platformexport packing: beam and upright use plastic wrapping film, and other match parts use paper carton.
Supply Ability: 1000 Ton per Month
Minimum Order Quantity: one '20 container
Payment Terms: T/T
Port: Nanjing
Fob Price: US$8000-10000Nanjing
Place of Origin: Jiangsu China (Mainland)
*Your name:
*Your Email:
*To:Nanjing Ebil Metal Products Co., Ltd.
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters Remaining: 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

We do inquire for you , please wait ...