Allow a minimum of 18hrs before appling the next coat.
1.21.4kg is need per square meters to obtain an average dry film thickness of 1mm.
This system can be applied by roller, notched trowel or brush.
The mixed viscosity is suitable for application . If further dilution is desired, add solvent(T-T) about 510% of mixed resin .
Mix two components, PF-359 and E-145 with fixed ratio in a round bottom tub.
3) Base membrane
Primer is a single component and cure time is 34hrs for summer, 56hrs for winter.
All surfaces should be primed with primer(T-117, or T-44) prior to application at the rate of 0.20.3Kg per square meters.
2) Primer
All cracks over 1/16" in width shall be routed out to 1/4" in width and 1n depth and fill with polyurethane elastomeric sealants
All surfaces to be coated must be throughly dry and free from contamination including oil and dirt.
Before any flooring work is started the applicator shall thoroughly examine all surfaces for any deficiencies. Should any deficiencies exist the architect, owner or general contractor shall be notified in writing and correction made
1) Substrate preparation
3. Application
Gym floor such as basketball, volleyball etc.
Health club
2. Basic uses
Once cured this system offers to reduce injury of the athlete and particular sport-related properties such as low energy loss and optimal sliding behavior.
This monolithic, liquid applied two component flooring system is recommended for use on sport-related floor which are needed to have long life under various conditions.
1. General
This monolithic, liquid applied two component flooring system is recommended for use on sport-related floor.
Product Material: | Plastic |
Pattern: | no |
Technics: | polyurethane |
Function: | Waterproof |
Usage: | Sports |
Brand Name: | PLYADEK PF-359 |
Place of Origin: | Gyeonggi-do South Korea |