Allow to dry for approximately 4 days
Corner tool optional
Formwork must be approximately 200mm around the unit.
The inside must be levelled to the bottom of the angle iron and compacted.
The area should be cleared and levelled before the installation team arrives on-site. The unit is erected on 4 bricks (supplied by purchaser).
Tile adhesive or strong mortar mix is applied to the base.
Alternatively pavers can be used to raise the floor level internally to provide a water free surface.
When it comes to flooring, there are several options open to the purchaser.
However, please note that Tilley Sheds do not supply flooring.
Flooring
When it comes to flooring, there are several options open to the purchaser. However |