Melamine MDF:
Delivery Time: | 15 work days afteradvanced payment |
Package: | Standard Export Package |
Supply Ability: | 1,000,000 Piece/Pieces per Year |
Minimum Order Quantity: | 100 Piece/Pieces |
Payment Terms: | L/C,T/T |
Port: | Guangzhou Port |
Fob Price: | US$7.5-25Guangzhou Port |
Teak: | 80 |
Brand Name: | APEL |
Place of Origin: | Guangdong China (Mainland) |
1.Annual output: 5million to 30 million sqm(based on thickness of 9.5mm gypsum board) 2.Working time: 24hours/day and 300 working days/year 3.Raw material: Gypsum powder, shielding paper, modified starch, foaming agent, glue 4.Fuel: Natural gas, diesel, heavy oil or coal ...
Machine Capability Annual Capacity 2 to 30 Million Sq.m/year Our Experience 16 years Production process Dosing section—forming section—cutting and drying section—edge trimming and stacking section Product specification Length:2400mm-3600mm, Width: 900mm-1220mm, Thickness: ...
Come From Hebei xiangyi mechanical co.,ltd
Equipment Introduction Gypsum board production line based configuration table Annual production(㎡) Plant area(㎡) Drying method Total installed capacity Productin linespeed (m/min) Requird workers Electrical configuration 1.5 million 60m×26m Thermal oil 116kw ...
Come From Shijiazhuang Wuxing Mechanical Co., Ltd.