The Super Structure can also be positioned on a lined brick pit provided that it complies with the dimensions as set out in the specifications.
It is recommended that the appointed engineer provides supervision during the construction of a brick / block lined pit system.
These pits can be made deeper if a larger pit volume is required. Larger pit
volumes will only contribute towards longer pit life-spans.
High Water Table Conditions:
The pit structure complies with all handling and construction specifications
as for the Super structure. Emptying of the pit, if and when required is done
by removing the back cover slab.
Lined brick / block Pit:
Betram advocates that all pits to be sealed watertight. Attached hereto is the specifications on watertight lined pit structures and open lined structures. We also advocate the construction of
sealed brick or block structures.
All concrete elements are manufactured to the same specifications as for the Super structure. The pit is designed to suit all types of soil conditions and Geotechnical scenarios. The Betram
pit volume is 1580 liter. (1.58 cubic meter)
The concrete lined bottom Pit Structure consists of:
Betram through its research and development programme
designed a sanitation system that holistically fulfill these
desires of an ultimate pit system.
Long beams (4) Short beams (5) Side panel (4) End panel (2) Back cover slab (1) (water closet) |
Type:Other Garden Buildings Sub-Station Structures ...
Come From National Steel Industries
The structure consists of eight concrete panels manufactured with high strength reinforced concrete (40 mPa @ 28 day cube test) with an esthetically smooth finish. All panels are manufactured under strict quality control measures and conform to specifications as laid down in ...
Come From w.amalooloo.