GTe heating cable

In addition,water can get into the roof and walls of the building,leading to expensive structural damages such as brolen roof tiles,damaged plaster and facades,etc.

As the melted snow runs from the roof into could gutters and drain pipes,it can re-freeze forming layers of ice that can continue to build up until the flow is blocked.This can result in damaged drains and gutters.

Snow that has built up on a roof will start to melt as a result of either exposure to the sun or from heat rising from the building below.

  • Country:China (Mainland)
  • telephone:86-553-3887088
Payment Terms: L/C,T/T
*Your name:
*Your Email:
*To:Wuhu Jiahong New Material Co., Ltd.
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters Remaining: 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

We do inquire for you , please wait ...

Induction Heating Machines In Wire And Cable

A lot of cables need to be heat-treated before further processing. There is a lot of request about the online induction heating wire with fast speed, different temperature range, accurate power output, and temperature control on small diameter wires; thus, a precision heating ...

Come From Chengdu Jinkezhi Electronic Co., Ltd

middle high voltage 35kv heat shrinkable cable joint

Model:JRS-33KV Heat shrinkable joint will be applied for the branch connection of 33kv,25-500mm2 rubber and plastic cable cross section and installed in cable bridge,cable trench and outdoor.Right now it is the most convenient and safe branch joint in market.It adopts heat ...

Come From Changlan electric technology co.,ltd.

6~20kv heat shrink outdoor cable termination

Model:WRS-20KV/NRS-20KV This product is used for 6/10, 8.7/10,8.7/15,12/20kv 25-500mm2 XLPE insulation cable and EPR insulation cable both for single core and three cores indoor and outdoor cable termination and joint,the function is for insulation,sealing and connection.The ...

Come From Changlan electric technology co.,ltd.