The installation and use of thermal resistance
,,. Thermal resistance should be installed in the furnace to avoid the side or away from the heater too close to the Department, should be installed in the absence of vibration or vibration small
place, and at the same time to facilitate the construction and maintenance. ,. Installation location should be as far as possible the vertical, but when there is flow must be inclined to install. .
Junction box should be the bottom of a hole.
,. Thermal resistance should be required to wiring, commonly used three-wire system. ,
wz series of industrial thermal resistance as a temperature measurement sensor, usually associated with temperature transmitters
Delivery Time: | 23-30days |
Package: | per air filter one opp bag or neutral packing as per customer's requirement |
Supply Ability: | 80000 Piece/Pieces per Month |
Minimum Order Quantity: | 200 Piece/Pieces |
Payment Terms: | L/C,T/T,Western Union |
Port: | shanghai/ningbo |
Brand Name: | dilicn |
Place of Origin: | Zhejiang, China (Mainland) |