7. Inductive and condensive load are prohibited.
6. Explanation of output mode: The LED digital tubes display the reserved number of mode, if the demonstrated number is discrete (0-5), then the corresponding load is 1. If it is a number with decimal point (0. To 5.), then the load is 2. 6 or 6. are set as the manual switch mode universal control, 7 or 7. are set as the debug mode of pure light control.
5. 7-7. Debug mode: applies to system debugging. It is similar to pure light controlmode, which only disabled 10 minutes delay and retains all the other functions. Load connects when there is light signal and disconnect when not, which is convenient for examining the system establishment
4. 6-6. General Mode of control: this mode disables light control, time control, output time delay and related functions, reserves all the rest functions. Controller under this mode is used as general controller.
3. 1-5 light control+ time delay: startup process as previous. The load will shut down after work to the reserved time. Time setting table as follows.
2. 0 The pure light control: when there is no sunlight, luminous intensity fall to the initiating spot. After the controller confirming signal of startup in 10 minutes delay, the load start to work. When there is sunlight, luminous intensity rise to initiating spot. After the controller confirming the signal of output turnoff in 10 minutes delay, the load stop working.
1.Press down the system setting button for 5 seconds, after digit LED twinkles, loosen the button, presses once to change the number every time until the number demonstrated on digit LED equals the number of mode chose from table by user. The establishment finishes when digit LED stops twinkling. Notice: when the 6 or 6. and 7 or 7. are applied ,the two output routes were synchronous controlled. It needs to reset 1-5 or 1.-5. to access two routes independent control. The number can be observed every time LED lightens up while pressing the button. When 6 or 6. and 7 or 7 are observed, the demonstrated number will not change. When 1-5 and 1.-5 are observed, the first 3 seconds indicate the setting of first group of loads, after 3 seconds indicate the setting of second group of loads.
4) Instructions for TYN-II P City Complementary Controller of Solar Lamps:
3. Do not connect regulator n. or any charger to the terminal of solar battery.44. Please choose multi-strand copper wire with over
It uses the advanced programmable microchip and the specialized software, can be applicable to all kinds of solar street lamps
Model Number: | shhhbkzq |
Brand Name: | shhtynhbkzq |
Place of Origin: | Jiangsu China (Mainland) |
Model Number:shhkzq Brand Name:shhtynkzq Place of Origin:Jiangsu, China (Mainland) rated voltage: 12V or 24V rated current: 10A ambient temperature: -20-60 altitude for use: less than 5000 meters ...
Come From Nanjing Shuanghao Mechanical & Electrical Integration Co., Ltd.