3) Connect + and - poles of load with the correct ports on the controller (the fifth and sixth wires from the left).
2) Connect + and - poles of battery with the correct ports on the controller (the third and fourth wires from the left).
1) Connect + and - poles of solar panels with the correct ports on the controller (the first and second wires from the left).
According to indication in the picture:
3. System connection
CE
-
Certificate
13
48 pcs/carton
-
Packing
12
102*45*107
mm
Unit size
11
135
g
Unit G.W
10
<210
mV
Loop voltage-drop
09
2.5
m
Max. Diameter of wire
08
Mini and Light in Size |