Spot Test Negative A.A.S.H.O.T102
Solubility in CS2(wt)% 99.5Max D-4
Flash Point 250Min D-92
Drop in Penetration after heating% 20Max D-6 D-5
Loss on heating(wt)% 0.2Max D-6
Ductility @25c 100Min D-113
Softening Point c 49/56 D-36
Penetration @25c 60/70 D-5
Specific Gravity 25/25cg 1.01/1.06 D-70
SPECIFICATION TEST METHOD
Penetration Bitumen 60/70 and Penetration Bitumen 85/100
Delivery Time: | 10Days. or at the Time of Contract |
Package: | in 180/200 New Drum or loose and in winter Plastic Bag. |
Supply Ability: | 10000 Metric Ton per Month |
Minimum Order Quantity: | 100 Metric Ton |
Payment Terms: | L/C,T/T |
Port: | CIF ASWP |
Grade: | 60 |
Place of Origin: | Iran (Islamic Republic of) |