WE CAN SUPPLY INDONESIAN STEAM COAL OF GROSS CALORIFIC VALUE OF 5800 - 6300 K.CAL/ KG UP TO 150000 MT PER MONTH AT A VERY COMPETITIVE PRICE.OUR MINES ARE LOCATED VERY CLOSE TO INDONESIAN PORTS SPREAD OVER 100 HECTARES WITH A MINIMUM DEPOSIT OF 6 MILLION TONNES.THE MINE IS DESIGNED IN 4 DIFFERENT PITS EACH PIT PLANNED AND OPENED IN A STRETCH OF 1 KILOMETER. WE HAVE OUR OWN MINING EQUIPMENT WHICH HELPS IN PLANNING AND MINING PROSPECTIVENESS WITH APPROPRIATE MEASURES. WE GUARANTEE THE ABOVE SPECIFICATIONS AS WE HAVE THE MINING ENGINEERS AND GEOLOGISTS WHO CAREFULLY PLAN AND DESIGN THE WORK OF EXCAVATION.
5800 - 6300 k.cal/kg GCV steam coal from INDONASIA,
Delivery Time: | 45 days |
Package: | bulk |
Supply Ability: | 100000 Metric Ton per Month |
Minimum Order Quantity: | 30000 Metric Ton |
Payment Terms: | L/C |
Fixed carbon -- by difference: | GCV - 5800 (rej <5600)k.cal/kg |
Sulphur (adb)-- less than 1.0%: | Volatile matter (adb)- 42% -- 44% |
Total moisture (arb)- 28%-30% max: | Ash content(adb)--8%-10% |
Hgi (adb) ----- 58%: | Size ---crushed 0- 50mm |