12). Royalty Basis US$ 6/MT
11) Loading point MV : TelukBalikpapan, 3 hours from Loading port (Jetty)
10). Loading atMentawir River with 300ft barge
9). Royalty Basis : US$ 6/MT
8). Deposit " Appox 8 - 15Mill MT.
GCV 7610 As Received Basis
C. GCV 7756 Air Dried Basis
B. Total Sulfur (weight %) =1.45 ADB
A. Total Moisture (weigth %) D3302-02 = 5.57
7). Coal test result by Carsurin:
6). Distance from Mine to Port : 22km. Available Logging road.
5). Thickness : 80cm - 1.5m.
4). No of Outcrop in the area : 6
3). License standing KPPU January 2009, running for Exploration
2). Located: Laokulu, Kutai kartanegara, 2 hours from Samarinda.
1). Area 2000ha
Coal Concession for Cooperation
We are looking for Partner/Investor for good coal concession in East kalimantan Indonesia
Application: | Steam Coal |
Type: | Other |
Place of Origin: | Kalimantan Timur Indonesia |
Application:Coking Coal Type:Other Place of Origin:Kalimantan Timur Indonesia We are looking for Partner/Investor to do Exploration in good coal concession in East kalimantan Indonesia ...
Come From Indonesian Mining Resources