lim joon hyeong - ( conversation in Indonesian and Korean )
antonius bambang. ( conversation in Indonesian and English )
Thanks and regards.
Please do not hesitate to reach us, if you have any questions or doubts.
Please find detail data and information in the attachment, include our mining site photograph showing our present ready stock of 54.000 metric tons plus daily production amounting to 2.000 tons.
The coal transportation from mine site is firstly by heavy duty truck to jetty at Sei puting river (21 km), then continued by barge. Barging operations are by tug and flat top barge ( jetty capacity is 8.000 tons up to 10.000 tons, combinations transporting coal either directly to consumers receiver ports or coastal offshore anchorage locations for trans- shipment to coal terminal facilities or to bulk carriers at an anchorage 15 miles of barito river entrance channel which can load vessel up to 200.000 dwt at up to 25.000 metric tons per day.
? Prices and terms are subject to change without prior notice.
? PAYMENT : IRREVOCABLE LC.
? FOB BARGE Sei Puting Jetty Location (B) : USD.37/metric ton
? FOB VESSEL LOADING LOCATION (C) : USD.42/metric ton
Coal Price :
8. H G I (ADB) : 45 52
7. Gross Calorific Value (ADB) : 5.300 5.500 K.cal/Kg.
6. Fixed Carbon (ADB) : by different
5. Volatile Matter (ADB) : 38 42 %
4. Sulphure Content (ADB) : 0.8 - 1 %
3. Ash Content (ADB) : 4 - 8 %
2. Inherent Moisture (ADB) : 10 18%
1. Total Moisture (ARB) : 30 32%
:
Coal Quality
f. Estimated Coal Deposit : 3.000.000 metric tons
e. KP.TRANSPORT & SALES : NO.90, dated,29-06-2004
d. KP.EXPLOITATION : NO. 90, dated 29-06-2004
c. KP.EXPLORATION : N0.89, dated June 24th,2004
b. Legality : Complete
a. Mine Site Location : Desa 11, Km, 92 Jl. Jend. Ahmad Yani, Tapin Regency
Our coal mine description is as follows :
Our coal mine location is situated at km 92, from Banjarmasin toward Rantau, the capital city of Tapin Regency. Southern Kalimantan province, Indonesia.
We. as the sole holder of an exclusive and irrevocable power of attorney to produce and to sell coal by ourselves from the KP ( Kuasa penambangan / Mining authority permit ) holder, for the protection of the buyer will be fully liable for the validity of the concession, and We CONFIRM and WARRANT that our coal product is produced from good CONNCESSION AREA, completed with official and legal documents including certificate of coal origin. In essence we must transact our coal in the right way. in order for the transaction of natural resources from Indonesia with our customers goes smoothly.
This is with great pleasure that I write this e-mail regarding our coal product which in short brief, as the following :
Dear Customers,
Presently we have ready stock amounting to 54.000 tons of coal produced from our own concession with GCV 5300-5500 k.cal/kg,
Minimum Order Quantity: | 30.000 Metric Ton |
Payment Terms: | L/C |
Port: | Tabunio anchorage location |
Fob Price: | US$42-45Tabunio anchorage location |
Ash Content: | 3,8 % (ADB) |
Coal Calorific: | 5.300-5.500 K.CAL/KG |
Application: | Steam Coal |
Type: | Lignite |
Brand Name: | STEAM COAL |
Place of Origin: | Propinsi Kalimantan Selatan Indonesia |