- trial order initially 40,000 Mton
- and then annual contract .
- Loading Port : Kalimantan.
- Loading rate is 7,000 day.
Indonesia Coal
Supply Ability: | 45000 Metric Ton per Month |
Minimum Order Quantity: | 40000 Metric Ton |
Payment Terms: | L/C |
Place of Origin: | Daerah Tingkat I Kalimantan Barat Indonesia |