Agus Pande
Best Regards.
If you are ready in dealing coal trading business with the above payment scheme, please contact me at +62-818-111500 or sens an email.
The last 10% payment should be done at the moment all requested trading documents are completed and the tug & barge is ready to leave the port.
10% at the moment the tug & barge arrive at the loading port.
40% at the moment the coal ready 100% at the stockpile.
40% at the moment the contract is signed.
The miner requested up-front cash-based payment under scheme as follow:
Currently I have a coal allocation as much as 40.000 tons/month from a reputable South & East Kalimantan miner. GCV is vary from 5300-5100 up to 6300-6100. In the near future the volume potentially can be increased up to 100.000 tons/month.
Quality Coal from South & East Kalimantan Miner
Surface Handling: | Heat Transfer Printing |
Trucking, Transportation, Trucking Company, Shipping Company, Coal Sales Services, Truck Driver Employment, Truck Driver Job, Truck Driver Services, Transport Services, Truck and Trailer Careers, Trucking, Transportation, Trucking Company, Shipping Company, Coal Sales Services, ...
Come From Nelsons Sunbeam Coal
Model Output capacity (kW) GasConsumption (Nm3/h) Specifications of the mixing plant EI300G 3750 380 500 EI600G 7000 750 1000 EI1200G 13500 1390 2000 EI1800G 21000 2200 3000 EI2500G 27000 2780 4000 EI3000G 31000 3250 5000 ...
Come From Ebico (China) Environment Co., Ltd.
Model Output capacity (kW) GasConsumption (Nm3/h) Specifications of the mixing plant EI300G 3750 380 500 EI600G 7000 750 1000 EI1200G 13500 1390 2000 EI1800G 21000 2200 3000 EI2500G 27000 2780 4000 EI3000G 31000 3250 5000 ...
Come From Ebico (China) Environment Co., Ltd.