Name of anchorage loading Muara jawa, samarinda & Teluk Balikpapan, Balikpapan
Name of port loading NRC, Muara Rico, Jongkang, Loa Buah and paser mayang river.
Stockpile to loading port +/- 2 KM until 11 KM.
Mining Location from stockpile +/- 5 KM, 15 KM, 35 KM, 40 KM
Stockpile
Kcal 5500 reject 5300 Maximum 3 Handymax Vessel or 40.000 MT
Kcal 5800 reject 5600 Maximum 3 Handymax Vessel or 40.000 MT
Kcal 6000 reject 5800 Maximum 2 Handymax Vessel or 40.000 MT
Kcal 6300 reject 6100 Maximum 3 Handymax Vessel or 40.000 MT
Kcal 6500 reject 6300 Maximum 1 Handymax Vessel or 40.000 MT
Kcal 6800 reject 6500 Maximum 1 Handymax Vessel or 40.000 MT
Ave prod cap/month from miner +/- 30.000 MT until 60.000 MT / total production capacity / 45 days.
Mining area Samarinda, kutai kartanegara, paser penajam, grogot, kota bangun.
Data Capacity
Company Name PT. InCor Energy
Delivery Time: | 8 Days |
Package: | Vessel Anchorage Port Capacity 40.000 / 60.000 MTVessel Anchorage Port Location From Port 36 miles ( +/- 12 hours )The Barge Feet 230 feet, 270 feet and 300 feet maxVessel by BCT port Capacity 120.000 MT / monthThe Loading Vessel 60.000 MT / 20 hours |
Supply Ability: | 8000 Metric Ton per Day |
Minimum Order Quantity: | 5500 Metric Ton |
Payment Terms: | L/C,D/P,T/T,MoneyGram |
Port: | Indonesia |
Fob Price: | US$72-115Indonesia |
Surface Handling: | Heat Transfer Printing |
Place of Origin: | Kalimantan Timur Indonesia |