TM (arb) : Maks 36%
IM (adb) : 6 - 9%
ASH (adb) : 8 - 11%
VM (adb) : 39 - 42%
FC (adb) : By Different
TS (adb) : Maks 1%
GCV (adb) : 5.500 Reject 5.300 Kcal/kg
HGI : Min 50
Size + 50 mm : 15%
0 - 50 mm : 85%
Price : $ 58 USD
Production : 40.000 mts/ month
Schedule Loading : 45 days at LC on
TM (arb) : 29 - 32%
IM (adb) : 13 - 16%
ASH (arb) : Maks 10
VM (adb) : 39 - 42%
FC (adb) : By Different
TS (adb) : Maks 1%
GCV (adb) : 5.800 Reject 5.600 Kcal/kg
HGI : Min 44
Price : $ 78 USD
Production : 40.000 mts/ month
Shedule Loading : 45 days at LC on
Please sent your orders
Delivery Time: | July 31, 2008 |
Supply Ability: | 80.000 Metric Ton per Month |
Minimum Order Quantity: | 40.000 Metric Ton |
Payment Terms: | L/C |
Port: | Mother Vessel ( Tabuneo Banjarmasin ) |
Fob Price: | US$58-78Mother Vessel ( Tabuneo Banjarmasin ) |
Object: | Trigger Sprayers |
Application: | VHS |
Surface Handling: | Heat Transfer Printing |
Type of Boiler: Natural circulation, forced circulation, steam and hot water supplied Mode of Combustion: Grate-fired furnace Form of Ex-factory: package or assembly Fuel: bituminous Coal, dry-burning coal, hard coal, ligneous coal, firewood (sawdust), grass residue, rice ...
Come From Wuxi Zozen Boilers Co., LTD
The lower part of the boiler is the burning device that is equipped with the light-type chain grate stoker, the coal supply machine, the ash extractor, the dust collector and the electric control box. It realizes the mechanization of coal supply and ash discharging and the ...
Come From Wuxi Zozen Boilers Co., LTD