Coal mining location: at Muara Tuhup, District Murung Raya, Central Kalimantan province, INDONESIA. 22,180 Ha concession areas based on head of district decision split into 11,260 Ha as feability study and 10,920 ha as exploration areas. The distance from coal mine to stockpile and jetty is only 5 km located at the side of Barito River. 450 km distance from jetty to Taboneo anchorage or +/- 5 days. The barge 270 feeth or 5500 MT workable for 7 month from the whole year, and remaining use lower barge. Geological at TUCOM concession has done 41 boreholes with total depth 1,139 meter , and getting coal tickness upto 1.4 m. 24 boreholes getting the coal and the remaining no find the coal seam. Stripping Ratio 1: 11. Surrounding drilling areas +/- 500 ha only, the reserve is 5 Million MT with depth 40 m. Based on the geological map of the Muara Tewe Quadrangle. Geological structure on this areas show regional trend of SW-NE and NW-SE. Faults consist of normal, horizontal and thrust faults which cut across the Tertiary Sendimentary units. Lineaments are probably reflecting as trace or faultz indication. Folds as synclines and anticlines indicates a similar trend to the regional structure. Contact: dr.oei(at)dscm.biz
COKING COAL MINE FOR JV
Supply Ability: | 480000 Metric Ton per Year |
Port: | BANJARMASIN |
Volatile Matter (%): | 42 |
Phosphorus Content (%): | 0.025 |
Moisture (%): | 1.09 |
Fixed Carbon (%): | 35 |
Sulphur Content (%): | 1.04 |
Application: | Coking Coal |
Type: | Anthracite |
Place of Origin: | Kalimantan Tengah Indonesia |