Freight Potential: Maximum 300 Feet Barge (8.000 ton), the distance from Jetty to Anchorage Point (Muara Jawa/berau) about 260 Mill.
Distance from minning to haulling (Pit 1 Blok A) to stock pile lies only 1 KM and from stock pile to jetty lies only +/- 0.35 KM.
Loading Potential: Temporary one (1) jetty available trucking manual 3.000 ton/day capacity. And in building process for one (1) jetty trucking (3.000 ton/day) and 1 (one) Jetty with conveyor(500 ton/hour capacity).
Coal Characteristics: Calorie ADB 48.00-5.400 kcal, TM 38-48%, IM 14-18%, Ash 5-6%, Sulfur 0,2%, VM 40-45%, FC 30-40%, HGI 60-70 black colour.
Potential Production: Production and loading recently began on December 2008, temporary capacity +/- 5.000 ton/day, production progress 300.000 ton / bulan. One (1) unit crusher 500 ton/hour capacity available.
Potential Area : Total minning area 5.000 Hektar, measured deposit +/- 105 Million Ton.
Minning & Port Area: Desa Linggang Marimun, Melak, Sendawar, Kutai Barat, Kalimantan Timur, Indonesia
OFFERING CRUSED OR ROW STEAM COAL TIRAMANA ENERGY IN MELAK KALIMANTAN TIMUR
Supply Ability: | 200.000 Ton per Month |
Minimum Order Quantity: | 6000 Ton 250.000 |
Payment Terms: | L/C,T/T |
Brand Name: | TIRAMANA ENERGY |
Place of Origin: | Kalimantan Timur Indonesia |