Steam coal for cement plant / Power plant

6) Shipment commerce

5) Issue L/C payment counter with 2% PB

4) Mining Inspection one(1) week after signing SPA contract

3) SPA contract sign

2) Buyer send draft SPA contract for review by both side

1) FCO buyers give confirmation with sign seal and return or ICPO

Procedures:

o Terms & Conditions : Will be defined in the contract after receiving letter of confirmation order/purchase.

o Price Review : every month

o Term of Payment : 100% L/C at sight. Irrevocable non-transferable from any international prime bank.

o Quality Certification : Quality and Quantity determined at loading port by an acceptable independent inspector

o Delivery Time : First two month shipment 30-45 day after receive confirm L/C. Next will be 30  days after last shipment.

o Contract Period : 12 month

o Quantity of Coal Supply : 40000 MT/month (+/-10%)

f) Total Sulfur (adb) : <1%

e) Fixed Carbon (adb) : 70

d) Volatile Matter (adb) : <12

c) ASH (adb) : <17

b) Inherent Moisture (adb) : <2

a) Total Moisture (adb) : <13

      Item                     

o Chemical Specifications:

o Origin : Sumatra, Indonesia

o Commodity : Indonesia Steam Coil

Details descriptions:

We are coal miner at Sumatra. Serious buyer please send your inquiry. We can discuss and negotiate further if interested.

try power plant    to get through more products

  • Ash Content:<17
  • Coal Calorific:GCV6900
  • Application:Steam Coal
  • Type:Other
  • Model Number:Coal
  • Place of Origin:Bengkulu Indonesia
  • Country:Indonesia
  • telephone:62-819-341460
Minimum Order Quantity: 8000 Metric Ton By barges
Payment Terms: L/C
Port: Bengkulu, Sumatra
Fob Price: US$58-65Bengkulu, Sumatra
Ash Content: <17
Coal Calorific: GCV6900
Application: Steam Coal
Type: Other
Model Number: Coal
Place of Origin: Bengkulu Indonesia
*Your name:
*Your Email:
*To:PT Pingxiang Mining Industry Group
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters Remaining: 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

We do inquire for you , please wait ...

Boiler Steam Header for Cement Plant

Chinaboiler steam header supplierprovides custom boiler steam header, manifold headers for superheater or any other heat exchangers in cement plant. The boiler steam header is actually a large diameter pipe connected with a lot of finned tubes. It is made of seamless steel pipe ...

Come From Sino Cement Spare Parts Supplier Co., Ltd

Power Plant Steam Flange Vacuum Globe Valve

FREE-Valve’smain body of theVacuum Globe Valveadopts a cast-forging structure, and has a parallel double-sealed pair and a half-forced two-way seal, and the sealing surface in-position movement and the wedge-shaped wedge wedge movement are step-by-step action to realize zero ...

Come From Zhengzhou Free Fluid Control Technology Co.,Ltd

air cooled condenser (ACC) of direct steam condensation for thermal power plant

Longhua\'s dry cooling provides Air Cooled Condensers (ACC) of all sizes for use in power generation. We can also provide ACC capacity increases and performance improvements to existing units.Our ACC system is composed of air cooled condensing tube bundles (single row and multi ...

Come From Luoyang Longhua Heat Transfer & Energy Conservation Co., Ltd