We are looking for Investor/Funder to do exploration in Indonesia:
Below several concessions open for Cooperation or hand over.
1).
2). Located: Sebulu Kutai Kartanegara, East kalimantan
3). License : KP Exploitation
4). Hauling : 6 km DONE
5). Loading : Mahakam River
6). Loading Muara Jawa
7). No of Outcrops : 10
8). thickness: 0.6 - 1.20M
9). Specs GCV 7268, TS 1.2%, ASH 1,02, TM 9,39, FC 52,53. VM 41.21
10). Royalty Base US$. ......./MT
+++++++++++++++++++++++++
B.
1).Concession Area :2600ha
2). Located: Laokulu, East kalimantan
3). License : KP Exploitasi vaild till 2012 and can extend
4). Hauling : 40km ex logging road
5). Loading : Mahakam River or Sepaku Sea
6). No of Outcrops : 100.
7). Specs GCV 6312, TS 0.26, Ash 1,3, TM. 13
8). Deposit 35mill MT.
9). Take over US$. ...... mill
++++++++++++++++++++++++
C.
1).Concession Area :1280ha
2). Located: Laokulu, East kalimantan
3). License : KP explorasi running to amdal
4). Hauling : 40km ex logging road
5). Loading : Mahakam River or Sepaku Sea
6). No of Outcrops : 30
7). Specs GCV 6100
8). Deposit 10mill MT.
9). Royalty US$. ...../MT
++++++++++++++++++++++++++
D.
1).Concession Area :3851ha
2). Located: Muara Kaman, Kutai Kartanegara, East kalimantan
3). License : KP explorasi valid till 2011
4). Hauling : 15km
5). Loading at : Mahakam River
6). Specs GCV TM 5.1, Ash 2, VM 45, FC 49, TS 2, GCV 7423
7). Deposit 5 - 10mill MT.
8). Royalty US$. ...../MT
There are many mining area around this concession.
++++++++++++++++++++++++++++++++++++
E.
1).Concession Area :250ha
2). Located: Laokulu, East kalimantan
3). License : KP explorasi (IUP)
4). Hauling : 30km ex logging road
5). Loading : Mahakam River or Sepaku Sea
6). No of Outcrops : 2
7). Specs GCV 6100
8). Deposit 3 mill MT.
9). Royalty US$. ..... /MT
++++++++++++++++++++++++++++
F.
1).Concession Area :5000 + 5000ha
2). Located: Kota Bangun, East kalimantan
3). License : IUP from New
4). Hauling : 70km Done to Balikpapan Gulf
5). Loading : Balikpapan Gulf
6). No of Outcrops : 10
7). Specs GCV 6400
8). Deposit 10mill MT.
9). Royalty US$. ..../MT
++++++++++++++++++++++++++++
G.
1).Concession Area : 1005ha,
2). Located: Panajam Pasir Utara, 1 hour from Balikpapan,
3). Legality : KPPU
4). Hauling : 500m - max 4km
5). Loading : Sepaku River and Sanggai River
6). Loading MV Muara Balikpapan (1 hour from both rivers)
7). No of Outcrops : 4 and more.
8). Thickness: 0.6 - 1.20M
9). Specs: Calorie ADB 6683, TM: 10.44%, Ttl Sulphur: 0.63
10). Deposit approx : 5 - 8 mill MT possible more.
11). Hand Over US$. 500.000
+++++++++++++++++++++++++++++++++++++++++++++++
H.
1).Concession Area : 1049ha,
2). Located: Panajam Pasir Utara, 1 hour from Balikpapan,
3). Legality : KPPU
4). Hauling : 500m - max 4km
5). Loading : Sepaku River and Sanggai River
6). Loading MV Muara Balikpapan (1 hour from both rivers)
7). No of Outcrops : 5 and more.
8). thickness: 0.6 - 1.20M
9). Specs TM 10.7, IM 7.7, Ash 7.7, VM 41,8, FC 42,8. GCV 6614. TS 0.52
++++++++++++++++++++++++++++
I.
1).Concession Area : 5000ha,
2). Located: Semboja, 1,5 hour from Balikpapan,
3). Legality : Selling and Transportation Done
4). Hauling : 18km Done
5). Jetty: Done
6). Loading : Anggana River can berthing 270ft barge
7). Loading MV Muara Balikpapan 5hours from Jetty
8). No of Outcrops : 20.
9). Seams thickness: 1.20 up to 3 m
10). Specs: GCV 5600, Ash 7, TS 0.98, VM 40.
11). Deposit: 25Mill MT
12). Take Over: US$. ... mill incl:
++++++++++++++++++++++++++++++
J.
1).Concession Area : 94ha,
2). Located: Samarinda, Kutai Kartanegara.
3). Legality : Selling and Transportation Done
4). Hauling : 19km Done (Has to be made to connect to main road 1,5 2Km)
5). Jetty: Done
6). Loading : River
7). Loading MV Muara Jawa
8). No of Outcrops : 5.
9). Seams thickness: 0.50 M up to 4 M
10). Specs: GCV 6500, TM 0.27, TS 0.42.
11). Deposit: 1,5 mill MT
12). Royalty fee US$.
+++++++++++++++++++++++++++++++
K.
1).Concession Area : 29ha,
2). Located: Anggana
3). Legality : Selling and Transportation Done
4). Hauling : 2km
5). Jetty: Done
Mahakam River 270ft
7). Loading MV Muara Jawa
8). No of Outcrops : 5.
9). Seams thickness: 0.50 M up to 3 M
10). Specs: GCV 6000, TM 0.32, TS 0.8.
11). Deposit: 600.000 MT
12). Royalty fee US$..../MT
+++++++++++++++++++
1). Concession Area : 100ha,
2). Located: Kutai Kartanegara
3). Legality : Exploration
4). Hauling : 8km
5). Jetty: Done
6). Loading : Mahakam River 300ft
7). Vessel: Muara Jawa/Muara Berau
8). No of Outcrops : 3
9). Seams thickness: 0.50 M up to 2 M
10). Specs: GCV 6500, TM 3,2, TS 0.8.
11). Deposit: 400.000 MT
12). Royalty fee US$./MT
We are Looking for Investor or funder for Coal Mining in Indonesia |
Hydroman® Submersible Coal Pump for Extraction of Coal on Mine serve a wide range of slurry transport applications, the 400TJQ submersible slurry pumps are designed for heavy duty, long wear life, low energy consumption, excellent performance, and easy maintenance. With ...
Come From HeBei Tobee Pump2 Co.,Limited
10/8 GAH Basin Coal Mine Slurry Pump Parts Cover Plate G8013 Slurry Pump Cover Plate Tobee® Slurry Pump Casing halves of cast or ductile iron with external reinforcing ribs provide high operating pressure capabilities and an extra measure of safety. Generally, the material of ...
Come From Hebei Tobee pump
Tobee® 350FF-L 煤矿泥浆泵湿部件,这种类型的泵专为处理轻磨料、低密度泥浆而设计,具有出色的磨损寿命,同时在磨损周期内保持效率,提供最佳的总运营成本。 电子邮件:Sales8@tobeepump.com|网址:www.tobeepump.com ...
Come From Hebei Tobee Pump Company