An authorized coordinator direct from principal sellers in a position to delivery of LNP, MAZUT and DIESEL D2. Serious and direct buyers or mandates only.
Liquidified Natural Gas (LNG)
Delivery Time: | 45 days |
Package: | Bulk |
Supply Ability: | 5,000,000 Metric Ton per Month |
Minimum Order Quantity: | 100,000 Metric Ton |
Payment Terms: | L/C |
Port: | Qatar |
Fob Price: | US$00Qatar |
Type: | LNG |
Place of Origin: | Russian Federation |
lng plant process LNG Liquefaction Plant After compression, the feed gas is processed by dehydration and heavy hydrocarbon separation units. Please see the attached PFD. LNG plant process description is detailed as follows: Feed gas compress unit After measuring, the feed gas ...
Come From Peiyang Chemical Equipment Co., Ltd.
LNG Plant Process Process of LNG Liquefaction Plant After compression, the feed gas is processed by dehydration and heavy hydrocarbon separation units. Please see the attached PFD. Process description is detailed as follows: Feed gas compress unit After measuring, the feed gas ...
Come From Peiyang Chemical Equipment Co., Ltd.
Product Description Developed for the industrial gas industry to indicate cryogenic tank liquid contents. It has 6-inch(152mm) or 4-inch(100mm) indicator and is designed for tank level, by providing a direct acting differential pressure indication of cryogenic liquids such as ...
Come From Dongying Lake Petroleum Technology Co.,