9. Delivery commences as perContract.
8. Seller specifies thedelivery schedule in the separate Appendix to the Contract.
6. Buyer within 7 days aftersigning the Sales and Purchase Contract issues Irrevocable, Transferable DLC,covering one month shipments, revolving per each shipment to shipment basis upto the total length of the Contract.
5. Seller and Buyer bothwill sign/seal the Sales and Purchase Contract at the meeting in Zurich in the Bank of theSeller. At this meeting in the Bank will be showed the Documents, confirmed theability of the Seller to deliver the contracted quantities.
4. Seller submits the draftcontract to the Buyer for review/approval.
3. Buyer issue ICPO.
1. Buyer issue LOI.
2. Seller issue FCO.
Procedure:
LNG available for long term contract.
Minimum Order Quantity: | 250,000 Metric Ton per Month |
Type: | LNG |
Place of Origin: | Qatar |
lng plant process LNG Liquefaction Plant After compression, the feed gas is processed by dehydration and heavy hydrocarbon separation units. Please see the attached PFD. LNG plant process description is detailed as follows: Feed gas compress unit After measuring, the feed gas ...
Come From Peiyang Chemical Equipment Co., Ltd.
LNG Plant Process Process of LNG Liquefaction Plant After compression, the feed gas is processed by dehydration and heavy hydrocarbon separation units. Please see the attached PFD. Process description is detailed as follows: Feed gas compress unit After measuring, the feed gas ...
Come From Peiyang Chemical Equipment Co., Ltd.
Product Description Developed for the industrial gas industry to indicate cryogenic tank liquid contents. It has 6-inch(152mm) or 4-inch(100mm) indicator and is designed for tank level, by providing a direct acting differential pressure indication of cryogenic liquids such as ...