The scrap consists of R50-R65 of Rails as R50 (51.67 kg/m GOST - 7173-75), R65 (64.72 kg/m GOST 8165-75) and Length: Fr, according to INCOTERMS 2000
Delivery Time: | 2-4WEEKS |
Supply Ability: | 100000 Metric Ton per Month |
Minimum Order Quantity: | 10000 Metric Ton |
Payment Terms: | L/C,T/T |
Port: | West Hampstead,London Port,UK |