6. Delivery Port - CIF China / Hong Kong
5. Port of Loading - The port of loading shall be any European port.
date of signing the contract or receipt of L/C whichever comes later.
4. Contract - The duration of this contract is for 12 months from the
of the financial instrument.
3. Availability - The commodity shall be loaded within 60 days of the availability
0.60 percent
b] The combined residuals other than manganese shall not exceed a total of
Nickel 0.45, Chromium 0.20, Molybdenum 0.10
residual alloying elements do not exceed the following percentages : percent
a] Manganese 1.65 Steel scraps shall be considered free of alloys when the
2. The material chemical composition is as follows:
1. Quantity of 480,000 MT in 12 shipments subject to prior sale.
Offer for supply of 40000MT x 12 shipments of 80% HMS 1 & 20% of HMS 2
Delivery Time: | Within 60 days from receipt of Letter of credit |
Package: | Shipping Documents to agree. |
Supply Ability: | 480000 Metric Ton per Year |
Minimum Order Quantity: | 45000 Metric Ton |
Payment Terms: | L/C |
Port: | Europe Port |
Fob Price: | US$315Europe Port |
Place of Origin: | France |