MSW Plant

3) For the exact proposal including plant budget, we need analysis data of your waste ( quantity per each kinds of wastes and moisture contents of each different type of organic waste such as food, plant and etc.)

2) Available pilot plant by the supplier under the condition that the client should pay for the pilot plant cost and main plant contract simultaneously after verifying successful operation of pilot plant.

1) Proven in Korea through 8 years operation

4. Remarks

5) Revenue of CER

4) Revenue of by-product sales such as RDF or RPF

3) Revenue from Solid fertilizer

2) Government subsidy for waste disposal

1) Save landfill space

3- Expected benefit

5)     Effect of green house gas reduction (CER)

4)     Low dost in construction and operation

3)     Resource of recycling energy

    No Dioxin , No HCB , No odor

2)     No secondary pollution during the waste treatment

* These above figures based on Korea MSW situation.

(2)   Volume reduction to less than 10% (over 90% reduced )

(1)   Weight reduction to 15-20% (85-80% reduced)

1)     Minimize final landfill rate of MSW environmentally clean & hygienic

2- Advantages

MSW bio reactor natural fertilizer , RDF (Refuse Derived fuel ) or RPF ( Refuse Derived fuel )

1- Technology

  MSW ( Municipal Solid Waste ) Plant

MSW treat by Mechanical & Biological treatment system

  • Type:Other
  • Place of Origin:Seoul South Korea
  • Country:South Korea
  • telephone:82-2-5512794
Type: Other
Place of Origin: Seoul South Korea
*Your name:
*Your Email:
*To:Toho Korea Corp.
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters Remaining: 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

We do inquire for you , please wait ...