BIOMASS GASIFICATION PROJECT
Biomass Gasification is an advanced process, which can covert agriculture waste into usable gas, its a clean fuel.
It will covert waste material into money, and benefit energy shortage communities. Especially in developing countries,
where fossil fuel and coal are not available or in shortage , however there are plenty of agriculture waste are available,
but people do not have technology to convert waste into energy. Following is a simple diagram to show that our process
can provide two systems to the communities, it is environmental friendly and affordable.
a. Material:
Rice hull, wood scraps, bark, bagasse, corn cob, agriculture waste and even grass.
(Moisture content less than 25%)
b. Power Generating Capacity: 1,000KW,
c. (200kw/unit. Expandable to 5,000kw.)
d. Plant Building : (1,000kw power plant)(For Power Generator installation)
360 sq. meter(20,000 sq. ft.)
e. Land space:(1,000kw power plant), (for Gasification Reactor installation and other usage)
2,000 sq. meter (20,000 sq. ft.)
f. Material Storage Area:225 sq. meter (2,250 sq. ft.)
Depend on type of material and storage quantity.
g. Material Consumption:
1.2kg-2kg materials can generate 1 kw/h electricity .(Depends on raw material)
h. Manpower required:(1,000kw power plant)
15 person (3 shifts)
i. Project Time Frame: Approx. 8 months after receipt of contract and Letter of Credit.(Not include ocean transportation period)
Project Design: 1 month
Equipment Fabrication: 3 month
On-Site installation: 2month
Test-Run& Adjustment: 2month
Ocean Transportation: _______
j. Detailed investment capital, revenue and cost , please refer to the data below. Civil work will be provided by local buyers.
1. Investment: USD1,000,000
For equipments, know-how and installation supervision.
2. Feasibility report:
(1) Revenue
Item Unit Quantity Calculation means
Working Days Day/year 320 365-45
Running Time H/Day 24
Power KW/year 6,912,000 24x1000x90%x320
Self-consumption KW/year 384,000 24x50x320
Power for sale KW/year 6,528,000 6,912,000-384,000
Unit price USD0.0757
Revenue Year USD 494,169.00 6,528,000x0.0757
3. Cost: USD96,000.00
Item Quantity Unit sum Total sum
1)Burning material 216KWx 1.5kg=32.4T/D 32.4x3.63=117.5x320 USD37,610.00
2)Salary and pay
(1) administration, mechanics 3 people USD 2900/y/per head USD8700.00
(2 )operators 9 people USD1450/y/per head USD13,060.00
(1) assistants 6 people USD 1000/y/per head USD6000.00
Sum 28,000.00
3)Maintenance cost
(1)gasifier 40days/year USD 60/day USD 2400.00
(2)generator 40days/year USD 60/day USD 2400.00
(3)lubricants USD 12000.00
(4)Others USD 6000.00
Sum USD22800.00
Administration Fee
(1) Office expenses Uds 250 USD3000.00
(2)Reception USD400 USD4800.00
Sum USD7800.00
Total Sum USD96,210.00
Profit Analysis:
1. Burning material can be rice hull, sawdust, bagasse etc
2. .Annual revenue: USD 494,169.00-96,210.00=USD397,960.00
3. Period for Investment Return:
USD1,000,000.00(total investment)/USD397,960.00