Waste management experts -ecoclean.in
Bio Garbage Recycling Plant
we offer a recycling plant with a cycle time of 2-4 hours waste conversion into usable saleable end products
turnkey plant machinery with the required technology
It convert garbage into usable bio fertilizer
interested in convert poultry waste into bio manure
convert fish waste into fish meal
waste management experts
Delivery Time: | 4-8 weeks |
Supply Ability: | 1 Piece/Pieces per Month |
Minimum Order Quantity: | 1 Piece/Pieces |
Payment Terms: | T/T |
Port: | chennai |
Fob Price: | US$1,000,000-3,000,000chennai |
Type: | Other |
Place of Origin: | India |
Model Output capacity (KW) Oil Consumption (kg/h) Specifications of the mixing plant EI300NQ 3750 300 500 EI600NQ 7000 650 1000 EI1200NQ 13500 1200 2000 EI1800NQ 21000 1900 3000 EI2500NQ 27000 2400 4000 EI3000NQ 31000 2800 5000 ...
Come From Ebico (China) Environment Co., Ltd.
7\"8\"10\"square disposable dinner plates provided by Luzhou Pack can be used to hold cake, snack,candy, chocolate, noodles and other foods, with the wide and high rim not to worry about spills and messes to serve saucy foods. Our disposable biodegradable disposable cups ...
Come From Shaoneng Group Guangdong Luzhou Eco Technology Co., Ltd.
Waste pyrolysis plant uk, Small garbage incinerator, trash disposal sink, Provide incineration plant design Solutions for waste disposal at the lowest cost Low-temperature pyrolysis of waste, design temperature 30-380℃. Process: evaporation, gasification, carbonization, ...
Come From Hangzhou fireprint Technology Co., Ltd.