f. Flue dust collecting system; Equipped with water hammer cyclone dust collecting room, which makes sure the discharged flue gas reach national emission standard.
e. High efficiency fuel gas heating system. When the heated gas reaches 150 during refining, a large amount of gas will be generated: through methane to butane, which cannot be liquefied under normal temperature. A large quantity of energy will be generated after these gases fully burn within a specially designed gas burner. Then energy will be saved greatly.
d. The heating system adopts hot air heating technology, which improves the safety performance of production and heating efficiency.
c. The release of pressure during the production dramatically increases the output within certain time and meanwhile improves the quality of oil.
b. The pressure release device operates through water circulation, which greatly improves the security of the system.
a. The complete set of unit produces no smoke and smell with favourable effects of environmental protection.
JL-1 distillation device is widely applied to purify the fuel oil, waste oil and crude oil
Delivery Time: | 20-30days |
Supply Ability: | 200 Set/Sets per Year |
Minimum Order Quantity: | 1 Set/Sets |
Port: | China main port |
Model Number: | JL-1 |
Brand Name: | Donghe |
Place of Origin: | China (Mainland) |