Water Purification Machine

When Red Light (Red Lamp) Is "On", Filter Switch "Off" And Close All Valves And Open Valve Only. Press Dehydrate Button 5~6 Times With 3 Second Interval And Open/Close Of Valves And Start Again From Initial Pre-Coat Process.


DEHYDRATE PROCESS


FILTERING PROCESS

Open , Valve Only & Filter Switch "On" ( Continuous Use )

Open/Close Of Powder Control Lever 2~3 Times, Open & Valve Only And Filter Switch "On" & Check Sight Glass ( It Takes About 2 Min )


INITIAL PRE-COAT PROCESS

PREPARATION

Water Purification Machine

  • Place of Origin:Seoul South Korea
  • Country:South Korea
  • telephone:82-82-2-444-2025
Place of Origin: Seoul South Korea
*Your name:
*Your Email:
*To:BAISHAN TECHNET
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters Remaining: 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

We do inquire for you , please wait ...