12. 9mw Cogeneration Plant

(1) CONTROL SYSTEM TO OPERATE THE ENTIRE PLANT

(2) ELECTRICAL TRANSFORMERS.

(1) COOLING TOWER WITH ASSOCIATED PUMPS.

(1) WATER TREATMENT PLANT WHICH INCLUDES: CULLIGAN REVERSE OSMOSIS SYSTEM, CIRCULATING AND VACUUM PUMPS, STAINLESS STEEL AND PLASTIC STORAGE VESSELS, SAND FILTERS AND CONTROLS.

(1) 3.2MW POSTCOMBUSTION BURNER.

16 TON/HR 61.5 BARG SUPERHEATED AT 450 DEG.C. STEAM (FROM 62BARG SATURATED STEAM) WITH OR WITHOUT POSTCOMBUSTION.

15.7 TON/HR 62 BARG SATURATED STEAM WITHOUT POSTCOMBUSTION.

22 TON/HR 62 BARG SATURATED STEAM WITH POSTCOMBUSTION.

3.9 TON/HR 10.2 BARG SATURATED STEAM WITHOUT POSTCOMBUSTION.

3.2 TON/HR 10.2 BARG SATURATED STEAM WITH POSTCOMBUSTION

(1) STEAM BOILER WHICH INCLUDES (3) STEAM RECEIVER VESSELS, PLATE HEAT EXCHANGERS, (2) SULZER TYPE MC50-220/13 BOILER FEED PUMPS WITH 12 STAGE, INTERMEDIATE EXTRACTION AT 40 BAR AND FINAL EXTRACTION AT 90 BAR. STEAM BOILER IS RECOVERY TYPE WITH TWO LEVELS OF STEAM PRESSURE, CAPACITY AS FOLLOWS: -

(1) 2.6MW STEAM TURBOGENERATOR

(1) 100 NATURAL GAS TURBOGENERATOR

This Cogeneration Plant consists of:

 

This is a 12. 9mw Capacity Cogeneration plant with gas turbine, steam boiler, and steam turbine

  • Place of Origin:Europe
  • Country:
  • telephone:
Minimum Order Quantity: 1 Piece/Pieces
Place of Origin: Europe
*Your name:
*Your Email:
*To:
*Subject:
*Message:
Enter between 20 to 3,000 characters. English only.     Characters Remaining: 0 / 3000
*Enter the secure code shown below Mfrbee security Image      Reload Image

We do inquire for you , please wait ...

Tobee 5 Vanes Impeller 12/10 Slurry Pump For Copper Concentration Plant

Application: Mining & Mineral Processing Theory: Centrifugal slurry Pump Product name: Slurry Pump Impeller Material: Hyper chrome alloy,Rubber, Size: Standard Size 12/10 OEM: OEM services Provided Speed:300-800 rpm Package:Standard Wood Box Web.:www.tobee.store Email: ...

Come From Tobee pump Co.

China offer AST solenoid valve SV13-12V-0-0-00 for power plant

\"China offer AST solenoid valve SV13-12V-0-0-00 for power plant Deyang YOYIK for hundreds of thermal power plants, hydropower stations, metallurgical enterprises overhaul provided high-quality equipment selection, construction design, installation commissioning, after-sales ...

Come From DEYANG DONGFANG YOYIK ENGNIEERING CO

2 sets of 12T/D waste tire pyrolysis plant installed in Guangdong

Guangdong Heyuan customers purchased two sets of 12T/Dwaste tire pyrolysis plantAccording to customer’s feedback, the local environmental protection bureau is very strict with environmental protection. Before he decided to cooperate with onewaste tire pyrolysis plant Take the ...

Come From DoingGroup