Before selecting WSZ-A equipment, we must firstly understand the nature of sewage, water quality of water inflow, water quantity and the discharge standards required.
WSZ-A wastewater treatment plant can be buried below the surface in the design, also can be placed above the surface, and also can be semi-buried. The pipes among all equipment boxes are provided by our unit. Just linking the pipes and water inflow and outflow pipes among the boxes good and connecting the cable before running, then you can run the equipment. If this equipment is used in cold areas, raising inspection holes, burying the equipment below permafrost, and then the equipment can be normally operated. In the south area, the equipment can also be placed on the ground outside without building houselet. This equipment can be arranged in standard manner, if there are special circumstances, the three boxes can be arranged in accordance with the terrain.
whole Steel
under-ground/on ground installation
completed set
Anti-corrosion
three chambers
Delivery Time: | 60 workdays after issuing purchase order |
Package: | exporting package |
Supply Ability: | 500 Unit/Units per Year |
Minimum Order Quantity: | 1 Unit/Units |
Payment Terms: | L/C,T/T |
Port: | shanghai |
Fob Price: | RMB200,000-999,999,999shanghai |
Type: | WSZ-A |
Place of Origin: | Jiangsu China (Mainland) |