Details: 1.All set production line is the most advanced and full-automatic in the world at present. 2.The products with stable quality, and according with the international standard.The product
percent of pass can reach 95%. 3.Reduce the waste of materials.Wasting of the latex rubber is less than 10% of the manual production, this part of wasting costs can afford one S serie Benz car. and
the production cost significantly lower than the cost of manual production. 4.The balloons of foley catheter with high consistency and stability. 5.Can get the costs of machines back within 6 months.
6.The capacity is 1,000,000-3,000,000pcs/month
Post by Jim Yeung Beauty & Personal Care @2013-05-15 04:59:58