Searching material , total 680244 products,queries done in 490 ms

seamless pipe

Delivery Time In 20 days after we receive the deposite Package Pipes will be packed into bundles by the steel strip Supply Ability 5000 Ton per Month Minimum Order Quantity 20 Ton Payment Terms L/C,D/A,D/P,T/T Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Oil

Hai'an Marsden Metal Products Co., Ltd.   

Q345 Fluid Pipe

Delivery Time within 10 days Package as per your requirements Supply Ability 3000 Ton per Week Minimum Order Quantity 1 Ton Payment Terms L/C,Western Union Port Tianjin Port Fob Price US$300-600Tianjin Port Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Boiler

Tianjin Fengtai Huixin Steel Trading Co., Ltd.   

scaffold pipe

Delivery Time 15-45DAYS Package PACKED IN BUNDLE Supply Ability 5000 Ton per Month Minimum Order Quantity 10 Ton Payment Terms L/C,T/T Port XINGANG PORT Fob Price US$500-900XINGANG PORT Technique Hot Rolled Section Shape Round Secondary Or Not Non-secondary Alloy Or Not Non-alloy

Sanli Industry Co., Ltd.   

Pre galvanized pipe(Made by galvanized steel strip)

Delivery Time 15~30 days after receive your deposits. Package Our products can be packaged in bulk, bundles, or PVC. Supply Ability 5000 Metric Ton per Month special orders we can do as customers'requests. Minimum Order Quantity 5 Metric Ton according our production ability and s

Efya International Imp. & Exp. Co., Ltd.   

A Round Welded Tube

Delivery Time 10-25days Package Each piece in polybag and carton, crated, or as per customer's requirements. Supply Ability 5000 Ton per Month Minimum Order Quantity 5 Ton Payment Terms L/C,T/T Port Foshan Fob Price US$1650-4000Foshan Grade 300 Type Welded Technique Cold Rolled S

Foshan City Nanhai Sunwin Stainless Steel Co., Ltd.   

square pipe

Minimum Order Quantity 30 Metric Ton Thickness 2.0MM-12.0MM Outer Diameter 20MM-300MM Grade Q195/Q215/Q235/Q345 Specification 20-300 Technique Welded Section Shape Square Place of Origin Hubei China (Mainland) Grade Q195 Usage water,gas ,scaffolding,fencing Length 3M-12M Thicknes

Wuhan Runjin Commercial Co., Ltd.   

steel pipe

Delivery Time within 7 days or customer requirement Package 1. PP2. PE3. Bundle4. caps both ends5. according to customer requirement All for customer and all for customer benifit Supply Ability 25 Ton per Day Minimum Order Quantity 25 Ton Payment Terms L/C,T/T Port Qingdao/tianji

Liaocheng Xinhaifeng Steel Pipe Manufacturing Co., Ltd. (Development Zone)   

A106 Pipe

Delivery Time WITHIN 30 DAYS Package Painting,Caped on two ends,beveled or as the requirments of your customers Supply Ability 500,000 Metric Ton per Year Minimum Order Quantity 5 Metric Ton Payment Terms L/C,T/T Port QINGDAO,CHINA Secondary Or Not Non-secondary Alloy Or Not Non-

Jinan Zhongben Railway & Engineering Technical Co., Ltd.   

Electrical Conduit 25

Delivery Time 15 to 30 days,according to your PO. Package Bundle,tied with wires,covered with woven bag. Supply Ability 1000 Ton per Month Minimum Order Quantity 20 Ton 5 ton per size Payment Terms L/C,T/T Port Shanghai Fob Price US$2.08-3.60Shanghai Secondary Or Not Non-secondar

Zhangjiagang Yihuatong Metal Material Co., Ltd.   

Welded Steel Pipe

Delivery Time within 45 days Package steel package and sea worthy Supply Ability 40000 Metric Ton per Month Minimum Order Quantity 5 Ton or as client's requirement Payment Terms L/C,T/T Port Tianjin or Shanghai Fob Price US$500-900Tianjin or Shanghai Secondary Or Not Non-secondar

Qingdao Noble International Co., Ltd.   

seamless steel pipe

Delivery Time within 15 days Package seaworthy packing ,wooden cases Supply Ability 200000 Ton per Year Minimum Order Quantity 5 Ton Payment Terms L/C,T/T Port Tianjin Fob Price US$680-1000Tianjin Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Hydraulic Pipe Pl

Hebei Liqun Pipeline Trading Co., Ltd.   

hollow section

Delivery Time 15-30 days after recieve the LC or pre-paid Package Bundles,seaworthy wooden cases with or withoutedge protector, steel hoop and seals, or as percustomers' requirements Supply Ability 6000 Ton per Month Minimum Order Quantity 5 Ton Payment Terms L/C,T/T Port Tianjin

Tianjin Lode Import & Export Co., Ltd.   

galvanized steel pipe

Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Structure Pipe Place of Origin Guangdong China (Mainland) Thickness 2.0mm~5.00mm Outer Diameter DN15~DN300 Grade Q195, Q215, Q235 Standard BS, GB Thickness 1.0mm~9.mm Outer Diameter 21.3mm~355.6mm Grade Q235, Q215,

Guangzhou Pearl River Galvanizing Steel Pipe Works   

Square Steel Pipe

Delivery Time 10 to 20 days Package Standard seaworthy export packing, other types of packing can be customized as every client's requirements. Supply Ability 50,000,000 Ton per Year 0 Minimum Order Quantity 100 Ton 0 Payment Terms T/T Port Xingang Port,Tianjin Fob Price US$1-888

Tianjin Liwei Iron & Steel Co., Ltd.   

hot galvanized pipe

Delivery Time According to your order quantity Package Bundles Supply Ability 8000MTs per month Minimum Order Quantity 50 Ton Payment Terms L/C,T/T Port Tianjin Fob Price US$790-1400Tianjin Technique Seamless Product steel pipe Usage -- Length as request Surface Treatment Galvani

Xushui Xingwang Flange Co., Ltd.   

Square Steel Pipe and tube

Delivery Time 3--30days Package accroding to the clients' requirement Supply Ability 50 Ton per Day Minimum Order Quantity 2 Ton Payment Terms L/C,T/T Port Tianjin Seaport Fob Price RMB3000-5000Tianjin Seaport Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Flui

Cangzhou Datang Steel Pipe Co., Ltd.   

AISI316L seamless pipe

Delivery Time 30 days Package Packing Seawaothy cases or in bundles Supply Ability 20 Metric Ton per Month Minimum Order Quantity 500 Kilogram Payment Terms L/C,T/T,Western Union Port shanghai Fob Price US$3.8-8.5shanghai Section Shape Round Secondary Or Not Non-secondary Alloy O

Suzhou Guozhen Stainless Steel Co., Ltd.   

EMT conduit / Galvanized pipe

Delivery Time 60days Package bundles Supply Ability 300000 Ton per Year Minimum Order Quantity 20 Ton Payment Terms L/C,T/T Section Shape Round Secondary Or Not Non-secondary Alloy Or Not Non-alloy Application Structure Pipe Place of Origin Shanghai China (Mainland) Thickness 1.0

Shanghai Sonitic Steel Trading Co., Ltd.   

galvanized steel pipes

Package bundles packing Payment Terms L/C,T/T,Western Union Surface Treatment Galvanized Grade Q195 Surface Treatment Galvanized Grade Q195 galvanized steel hollow section Packing standard exporting packing Zinc Thickness 75G/M2 - 275G/M2 Length 6-6.5M Size 20-100 Material Q195 G

Hangzhou Amethyst Trade Co., Ltd.   

ERW carbon steel pipe

Delivery Time 7-14days re work extra hours Package IN BUNDLES , COVERED WITH PLASTIC WOVEN BAG, STRAPPED BY STEEL BANDS AND SUITABLE FOR LIFTING OPERATION. Supply Ability 600000 Ton per Year Minimum Order Quantity 20 Ton Payment Terms L/C,T/T,100% L/C at sight, or 30% T/T downpay

Beijing Reap International Trading Co., Ltd.